E-House Move Features New T-Lane Trailer!

On July 2, 2019  Category:  T-Lane Nation Case Studies

T-Lane moved a 220,000 lbs E-House that measured at a mere 82 ft. in length and 22.5 ft. in height. To complete this heavy haul move, a platform had to be installed on top of the building, on-site. T-Lane utilized our specialty 12 Line RS Platform Trailer, and a push truck to help with hill […]

Tags: , , , , , , ,

Transformer Transport – Forestburg, AB to Edmonton, AB

On May 23, 2019  Category:  T-Lane Nation Case Studies

Our heavy haul team in Alberta was working out of Forestburg, AB to remove an old transformer from site. This project required a route plan, utilities and specialized escort due to oversize dimensions. Jack and slide was required for both loading and offloading. This is a technique that T-Lane specializes in, it is used when […]